Steel and Sand: Monday Construction update

In the Great Hall, the walls are getting ready to be sheet rocked to cover the masonry blocks.
In the Great Hall, the walls are getting ready to be sheet rocked to cover the masonry blocks.
The concrete slab has been removed. No boulders, just sand! Steps to GH have not been removed yet.
The concrete slab has been removed. No boulders, just sand! Steps to GH have not been removed yet.
View from the Great Hall steps (that have not been removed yet). In the center is the original foundation wall which will be removed soon using a special carbide saw. A support column will remain between the new hallway being created on the left and the elevator pit to be dug on the right.
View from the Great Hall steps (that have not been removed yet). In the center is the original foundation wall which will be removed soon using a special carbide saw. A support column will remain between the new hallway being created on the left and the elevator pit to be dug on the right.
They have started welding steel braces in the Great Hall ceiling to hold the dropped ceiling.
They have started welding steel braces in the Great Hall ceiling to hold the dropped ceiling.
Under the floor near the meeting room and where the elevator pit is to go, they found a sewer pipe. Working on how to redirect this pipe now. This pipe was not shown on Gerry’s drawings. The plywood wall is LPC’s kitchenette wall.
Under the floor near the meeting room and where the elevator pit is to go, they found a sewer pipe. Working on how to redirect this pipe now. This pipe was not shown on Gerry’s drawings. The plywood wall is LPC’s kitchenette wall.